John Muir Medical Center Expansion and Central Utility Plant WALNUT CREEK , CA

VALUE DELIVERED
Contra Costa Electric delivered streamlined service for all switchgear and breaker installations, fire alarm system installation, and conduit installation for all other security, voice, and data systems. Their expert installation and use of BIM for service delivery planning helped keep all services on schedule. 


PROJECT SOLUTIONS

Hospital Phase IV Tower and Central Utility Plant – a new five-story, 242-bed, 347,000-sqaure-foot patient care tower that features expanded areas for the critical care unit, neonatal nursery, emergency, trauma, and surgery departments; relocation of the helicopter landing pad; a new central utility plant; and a 757-stall parking garage.

Additionally:
  • A new 3,000-amp breaker was added
  • Existing 6,000-amp emergency backup switchgear in the central utility plant to feed a new 3000-amp emergency switchgear in the new tower along with all down stream distribution boards and panels
  • A new fire alarm system in the new tower along with remodeling the existing buildings "A & B" with an updated fire alarm system and tie into the existing system
  • Contra Costa Electric installed conduit only for all other systems such as security, data, nurse call, etc.
  • Building Information Modeling (BIM) was used for coordination





BIOTECH/HEALTHCARE
HOSPITALS




OPERATING COMPANY
Contra Costa Electric

CLIENT
John Muir Medical Group

GENERAL CONTRACTOR
Clark Construction